Building a Buccaneer 

Photos of a Bucc being built by Nickels Boat Works
The attention to detail is very impressive

Back to Bucc menu

Deck molding nearly complete. The twing re-enforcement is glassed in place but the two blocks for hiking straps are not glassed yet. 
 

The thick section below the two wood blocks is re-enforcement for the jib track. The other thick sections are closed cell foam.

 

Bow showing snout and jib luff re-enforcement.

 

Forward buoyancy liner still sitting on it's mold.

 

Front bulkhead and mast tabernacle. 

 

Not much to show on the hull, it still needs floatation and re-enforcement etc.

Back to Bucc menu